• DocumentCode
    906516
  • Title

    Recent history of electricity supply in Hong Kong

  • Author

    Stones, W.F.

  • Volume
    131
  • Issue
    6
  • fYear
    1984
  • fDate
    9/1/1984 12:00:00 AM
  • Firstpage
    219
  • Lastpage
    221
  • Abstract
    Background information on the history of the electricity supply industry, in general, and CLP, in particular, is provided. The developments that led up to Castle Peak A and B power stations and the 400 kV transmission system are discussed. The collaborative investigation with China into a pumped storage scheme and a nuclear power station are mentioned, as is the problem of limiting the UK home orders for turbine generators to ratings of 660 MW, whereas overseas clients may require larger units. Credits are given to the collaborative efforts of the power company, the manufacturers, consultants and the various government departments.
  • Keywords
    electricity supply industry; history; 400 kV transmission system; Castle Peak A; Castle Peak B; Hong Kong; electricity supply; electricity supply industry; history; nuclear power station; power stations; pumped storage scheme;
  • fLanguage
    English
  • Journal_Title
    Generation, Transmission and Distribution, IEE Proceedings C
  • Publisher
    iet
  • ISSN
    0143-7046
  • Type

    jour

  • DOI
    10.1049/ip-c.1984.0031
  • Filename
    4643770