DocumentCode
907711
Title
Automatic Plant Start-Up System for BWRS
Author
Nakai, H. ; Hirata, K. ; Tsunoda, R. ; Watanabe, M. ; Murata, Y.
Author_Institution
Nuclear Control and Electrical Engineering Department, Nuclear Energy Group, Toshiba Corporation, Isogo Engineering Center, 8 Shinsugita-cho, Isogo-ku, Yokohama-shi, Kanagawa, Japan
Volume
32
Issue
1
fYear
1985
Firstpage
1084
Lastpage
1089
Abstract
An automatic plant start-up system, incorporating a process computer, is in use at Unit No. 1 of Onagawa Nuclear Power Station (a 524-MWe BWR) of Tohoku Electric Power Company. This system, based on and expanded automation techniques proven in fossilfired power plants, is the world´s first commercial base system for LWRs. The system automatically performs turbine start-up and controls reactor power by regulating reactor recirculation flow, thus reducing the operator´s workload and improving reliability, efficiency, and accuracy of plant operation. Both test data and practical operation have demonstrated the satisfactory performance of this system. This paper discusses system configuration, major functions, and results of performance tests at the factory and installation site, with special emphasis on power control.
Keywords
Automatic control; Automation; Control systems; Inductors; Power control; Power generation; Power system reliability; Production facilities; System testing; Turbines;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1985.4337003
Filename
4337003
Link To Document