DocumentCode :
909625
Title :
Experience in installing a computer control system in a hot strip mill
Author :
Ohnari, Mikihiko ; Morooka, Yasuo ; Yamamoto, Yasutaka
Author_Institution :
Hitachi, Ltd., Hitachi, Ibaraki, Japan
Volume :
58
Issue :
1
fYear :
1970
Firstpage :
30
Lastpage :
37
Abstract :
It is highly desirable to reduce the application period of a computer control system to a hot strip mill. Completion of a hot strip mill computer control system chiefly depends upon the time when slab tracking is operative, and on the setup calculation method and its checking method. For slab tracking, many support programs were devised such as dump, on-line monitor, process input-output simulator, and mill line simulator. To confirm the efficiency of the setup calculation method, a unique checking procedure has been developed and has proven to be quite effective. With these preparations for the installation of a computer control system in Sumitomo´s 80-inch hot strip mill, it took only five months in the field to put the full system into operation.
Keywords :
Application software; Computational modeling; Control systems; Debugging; Flowcharts; Milling machines; Slabs; Software testing; Strips; System testing;
fLanguage :
English
Journal_Title :
Proceedings of the IEEE
Publisher :
ieee
ISSN :
0018-9219
Type :
jour
DOI :
10.1109/PROC.1970.7538
Filename :
1449468
Link To Document :
بازگشت