DocumentCode :
909887
Title :
Powering the tunnel
Author :
Finn, J.S. ; Halsey, R.W.
Volume :
38
Issue :
9
fYear :
1992
fDate :
9/17/1992 12:00:00 AM
Firstpage :
303
Lastpage :
306
Abstract :
The aim of the Channel Tunnel project is to establish a fixed-link transportation system between England and France; the authors look at the progress of the electrical power supplies that are the backbone of that system. Electrical power is required for two quite different purposes within the tunnel: as the energy source for the railway locomotives, and for all the auxiliary systems required to operate the tunnels. This blend of traction load and auxiliary load, together with the fact that power is supplied from two different countries-by two systems that must not be paralleled makes the power supply system for this project unique
Keywords :
distribution networks; electric locomotives; load (electric); power supplies to apparatus; power systems; project engineering; Channel Tunnel; auxiliary systems; distribution networks; load; power supplies; power systems; project; railway locomotives; transportation;
fLanguage :
English
Journal_Title :
IEE Review
Publisher :
iet
ISSN :
0953-5683
Type :
jour
Filename :
217942
Link To Document :