    Powering the tunnel

  • Author

    Finn, J.S. ; Halsey, R.W.

  • Volume
    38
  • Issue
    9
  • fYear
    1992
  • fDate
    9/17/1992 12:00:00 AM
  • Firstpage
    303
  • Lastpage
    306
  • Abstract
    The aim of the Channel Tunnel project is to establish a fixed-link transportation system between England and France; the authors look at the progress of the electrical power supplies that are the backbone of that system. Electrical power is required for two quite different purposes within the tunnel: as the energy source for the railway locomotives, and for all the auxiliary systems required to operate the tunnels. This blend of traction load and auxiliary load, together with the fact that power is supplied from two different countries-by two systems that must not be paralleled makes the power supply system for this project unique
  • Keywords
    distribution networks; electric locomotives; load (electric); power supplies to apparatus; power systems; project engineering; Channel Tunnel; auxiliary systems; distribution networks; load; power supplies; power systems; project; railway locomotives; transportation;
  • fLanguage
    English
  • Journal_Title
    IEE Review
  • Publisher
    iet
  • ISSN
    0953-5683
  • Type

    jour

  • Filename
    217942