Title :
Factors to consider when upgrading transfer switching equipment to present codes and standards
Author :
Castenschiold, René ; Hogrebe, Lawrence F.
Author_Institution :
LCR Consulting Engineers, Green Village, NJ, USA
Abstract :
Some of the steps that should be considered when expanding or replacing equipment in emergency and standby power systems are discussed. The need for code conformance, reliable operation, and safety to personnel is discussed. For a better understanding, derived systems, ground-fault sensing, the impact of NEC (National Electrical Code) changes on yesterday´s and today´s installations, and the limited degree of isolation provided by three-pole transfer switches are reviewed
Keywords :
emergency power supply; standards; switching; NEC; National Electrical Code; code conformance; emergency power systems; equipment upgrading; ground-fault sensing; safety; standards; standby power systems; three-pole transfer switches; transfer switching equipment; Code standards; Conductors; Fault currents; National electric code; Power system protection; Power system reliability; Power systems; Safety; Switches; Wiring;
Journal_Title :
Industry Applications, IEEE Transactions on