Relay setting considerations and operational experience of a long 500 kV transmission line
Author :
Mustaphi, Kalyan K. ; Zimering, Ruben
Author_Institution :
Northern States Power Co., Minneapolis, MN, USA
fDate :
1/1/1988 12:00:00 AM
Abstract :
The large capacitive susceptance, large load magnitude, and substantial phase unbalance before and after a single-pole trip operation have a substantial effect on the performance of the protective relaying systems of the Minneapolis-Duluth 500 kV line. Computer simulation studies show that correct operation of the relays can be assured if these effects are taken into consideration in determining relay settings. The selection, performance, and operation of the primary and secondary relay system are discussed, indicating that the relaying protection used achieved substantial security and dependability
Keywords :
power system protection; power transmission lines; relay protection; 500 kV; Minneapolis-Duluth 500 kV line; capacitive susceptance; computer simulation studies; phase unbalance; protective relaying systems; relay setting considerations; single-pole trip operation; transmission line; Cities and towns; Computer simulation; Impedance; Lakes; Power system transients; Protection; Protective relaying; Rail to rail outputs; Relays; Security; Transmission lines; Voltage;
Journal_Title :
Power Delivery, IEEE Transactions on