• DocumentCode
    930448
  • Title

    Role of the consulting engineer in hydro and pumped storage systems

  • Author

    Murdoch, G.B.

  • Author_Institution
    Merz and McLellan Ltd., Newcastle upon Tyne, UK
  • Volume
    131
  • Issue
    6
  • fYear
    1984
  • fDate
    8/1/1984 12:00:00 AM
  • Firstpage
    383
  • Lastpage
    388
  • Abstract
    From the earliest stages in the development of a hydroelectric scheme, economists, planners and engineers must work closely together. Within the engineering group, collaboration is even more essential and it will be most effective if civil, mechanical and electrical engineers have a sympathetic understanding of each other´s technical problems. This collaboration should continue from the initial planning stages to the commissioning and testing of the complete installation. The paper discusses some of the problems which may arise at the various stages in the design and construction of a scheme. It is assumed that a decision has been taken to build a scheme of a certain ultimate capacity, and the paper considers the economic and technical planning, for example, to determine the rating and number of machines together with the programme for the construction of the civil works and installation of plant. For the project design, many aspects call for joint studies involving civil, mechanical and electrical engineers, for example, the head and rating, to determine the type of turbine and the approximate speed. Hydraulic design requires close collaboration between the three disciplines, to determine an economic system for the range of loading conditions to be imposed on the plant. The preparation of technical specifications proceeds concurrently in all three disciplines, for which a continuous exchange of information is essential, and the adjudication of tenders must take into account the interaction of plant and civil works. Detailed design proceeds after the placing of contracts, when further refinements are made. At the commissioning stage, close collaboration is essential, during the first filling of the hydraulic system and subsequent tests involving the hydraulic and electrical transmission systems, to prove satisfactory performance.
  • Keywords
    design engineering; management; project engineering; pumped-storage power stations; civil engineering; commissioning; construction; consulting engineer; design; electrical engineers; hydraulic design; mechanical engineering; pumped storage systems;
  • fLanguage
    English
  • Journal_Title
    Physical Science, Measurement and Instrumentation, Management and Education - Reviews, IEE Proceedings A
  • Publisher
    iet
  • ISSN
    0143-702X
  • Type

    jour

  • DOI
    10.1049/ip-a-1.1984.0059
  • Filename
    4646280