Title :
Totally integrated control system for the 220 MW cogeneration plant Mellach
Author_Institution :
Steirische Wasserkraft und Elektrizitatswerke AG, Graz, Austria
fDate :
3/1/1989 12:00:00 AM
Abstract :
The various reasons for specifying a totally integrated control system of the distributed type are discussed. As the plant is highly automated and comprises DENOX and desulfurisation equipment and a large coal handling yard, savings in cabling by using signal transmission through buses was also considered. Experiences during design, commissioning, and two years of operation, including failure rates, are presented
Keywords :
air pollution detection and control; cogeneration; distributed control; flue gas desulphurisation; power station computer control; thermal power stations; 220 MW; FGD; NOx; SO2; air pollution control; cogeneration; commissioning; design; distributed control; integrated control system; power station computer control; thermal power stations; Automatic control; Automation; Boilers; Centralized control; Cogeneration; Control systems; Microprocessors; Power cables; Power system reliability; Temperature control;
Journal_Title :
Energy Conversion, IEEE Transactions on