DocumentCode :
947527
Title :
A Cost Control Extension of the PERT System
Author :
Beckwith, R. E.
Author_Institution :
Aeronutronic Division, Ford Motor Co., Newport Beach; University of Southern California, Los Angeles, Calif.
Issue :
4
fYear :
1962
Firstpage :
147
Lastpage :
149
Abstract :
The anticipated total cost of a complex project is placed on a simple statistical quality control basis, through a natural extension of the PERT system of management control. The method is designed to provide management with the earliest possible warning of a potential budget overrun, consistent with the uncertainties inherent in the basic data. The procedure, when applicable, can readily be made to augment standard PERT programs, thus providing an integrated package for the simultaneous (probabilistic) control of project time and project cost.
Keywords :
Control systems; Cost function; Industrial control; Packaging; Performance loss; Pricing; Project management; Quality control; Research and development management; Uncertainty;
fLanguage :
English
Journal_Title :
Engineering Management, IRE Transactions on
Publisher :
ieee
ISSN :
0096-2252
Type :
jour
DOI :
10.1109/IRET-EM.1962.5007695