Title :
A Cost Control Extension of the PERT System
Author_Institution :
Aeronutronic Division, Ford Motor Co., Newport Beach; University of Southern California, Los Angeles, Calif.
Abstract :
The anticipated total cost of a complex project is placed on a simple statistical quality control basis, through a natural extension of the PERT system of management control. The method is designed to provide management with the earliest possible warning of a potential budget overrun, consistent with the uncertainties inherent in the basic data. The procedure, when applicable, can readily be made to augment standard PERT programs, thus providing an integrated package for the simultaneous (probabilistic) control of project time and project cost.
Keywords :
Control systems; Cost function; Industrial control; Packaging; Performance loss; Pricing; Project management; Quality control; Research and development management; Uncertainty;
Journal_Title :
Engineering Management, IRE Transactions on
DOI :
10.1109/IRET-EM.1962.5007695