Title :
Beat the system [GB Grid Code]
Abstract :
This paper discusses the technical modifications that were made to UK windfarms in order to comply with the provisions of the GB Grid Code. These modifications include better voltage control either by adding fast-switched capacitances and reactances to existing turbines or by using turbines that incorporate their own power electronic converters. Another technical modification is better response to over- and under-frequency via the use of site SCADA control systems. These technological advances coupled with the modernization of grid management techniques should securely provide a share of the UK´s future power needs.
Keywords :
SCADA systems; government policies; power convertors; power generation control; power supply quality; power system management; static VAr compensators; voltage control; wind power plants; wind turbines; GB Grid Code; SCADA control systems; STATCOM; UK windfarms; fast-switched capacitances; fast-switched reactances; grid management techniques; power electronic converters; power quality monitor; static compensators; supervisory control and data acquisition systems; turbines; voltage control;
Journal_Title :
Power Engineer