• DocumentCode
    957980
  • Title

    Process computer replacement and implementation of SPDS requirements at Millstone 2 nuclear power plant

  • Author

    Whitelaw, Michael J.

  • Author_Institution
    Northeast Utilities Service Co., Hartford, CT, USA
  • Volume
    35
  • Issue
    1
  • fYear
    1988
  • fDate
    2/1/1988 12:00:00 AM
  • Firstpage
    919
  • Lastpage
    923
  • Abstract
    A description is given of the scope of the project which provided and installed process computer hardware and software to replace the existing Millstone 2 (MP-2) process computer and incorporate the function of the Safety Parameter Display System (SPDS) in the computer. A discussion of the project responsibilities is followed by descriptions of the integrated computer system and the SPDS. The latter includes parameter selection, display data validation, the human-factors program, and the verification and validation program.
  • Keywords
    computerised monitoring; fission reactor safety; nuclear engineering computing; nuclear power stations; Millstone 2 nuclear power plant; SPDS requirements; Safety Parameter Display System; display data validation; hardware; human-factors program; implementation; integrated computer system; parameter selection; process computer replacement; software; verification and validation program; Cables; Computer displays; Data acquisition; Design engineering; Hardware; Power generation; Processor scheduling; Procurement; Software safety; Telephony;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/23.12861
  • Filename
    12861