Process computer replacement and implementation of SPDS requirements at Millstone 2 nuclear power plant
Author :
Whitelaw, Michael J.
Author_Institution :
Northeast Utilities Service Co., Hartford, CT, USA
Volume :
35
Issue :
1
fYear :
1988
fDate :
2/1/1988 12:00:00 AM
Firstpage :
919
Lastpage :
923
Abstract :
A description is given of the scope of the project which provided and installed process computer hardware and software to replace the existing Millstone 2 (MP-2) process computer and incorporate the function of the Safety Parameter Display System (SPDS) in the computer. A discussion of the project responsibilities is followed by descriptions of the integrated computer system and the SPDS. The latter includes parameter selection, display data validation, the human-factors program, and the verification and validation program.
Keywords :
computerised monitoring; fission reactor safety; nuclear engineering computing; nuclear power stations; Millstone 2 nuclear power plant; SPDS requirements; Safety Parameter Display System; display data validation; hardware; human-factors program; implementation; integrated computer system; parameter selection; process computer replacement; software; verification and validation program; Cables; Computer displays; Data acquisition; Design engineering; Hardware; Power generation; Processor scheduling; Procurement; Software safety; Telephony;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/23.12861
Filename :
12861
Link To Document :
بازگشت