• DocumentCode
    963917
  • Title

    Optimal short term operation of a purely hydroelectric system

  • Author

    Hreinsson, Egill B.

  • Author_Institution
    Dept. of Electr. Eng., Iceland Univ., Reykjavik, Iceland
  • Volume
    3
  • Issue
    3
  • fYear
    1988
  • fDate
    8/1/1988 12:00:00 AM
  • Firstpage
    1072
  • Lastpage
    1077
  • Abstract
    The short-term production scheduling problem for a purely hydroelectric system can be simplified so that the power production and water can be managed separately. This approximation is possible when plants have large daily reservoirs with fixed or controllable heads. The model described by the authors optimizes the hourly power production of a system of hydroplants by minimizing losses in turbines and waterways, while maintaining production to meet load. The problem is inherently of the mixed integer nonlinear type, but an algorithm has been developed to solve it in two stages by linear programming (LP). The model has been tested with data from an existing purely hydroelectric system, the Icelandic power system being the model system. Results indicate considerable savings in water usage from large seasonal reservoirs. These results also indicate the feasibility of installing the model in a control center computer when conditions are similar to the model system
  • Keywords
    hydraulic turbines; hydroelectric power stations; linear programming; power station computer control; power system computer control; scheduling; LP; control center computer; hydraulic turbines; hydroelectric system; linear programming; reservoirs; short-term production scheduling; Energy management; Engineering management; Hydraulic turbines; Linear programming; Power system management; Power system modeling; Production systems; Reservoirs; System testing; Water resources;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.14564
  • Filename
    14564