Title : 
Production measurement of energy doubler magnets
         
        
            Author : 
Gross, D.A. ; Wake, M. ; Yamada, R. ; Blatchley, D. ; Price, M.E.
         
        
            Author_Institution : 
Fermi National Accelerator Laboratory, Batavia, Illionis
         
        
        
        
        
            fDate : 
1/1/1979 12:00:00 AM
         
        
        
        
            Abstract : 
We have measured in recent months 50 Energy Doubler dipoles and 6 quadrupoles using a facility which currently averages complete measurements of 5 magnets a week (Fig. 1). Dipoles are 22 feet long with 3 inch diameter beam bore and produce a full field of 4.5T at 4500A. Quadrupoles are 7 feet long and produce a field gradient of 99T/m (Fig. 2). In the Energy Doubler, 4.23T corresponds to 1000 GeV. Magnets are measured individually for quench behavior, training, a.c. loss, harmonic content, integral field (gradient) length, vertical plane, longitudinal field homogeneity.
         
        
            Keywords : 
Accelerator magnets, superconducting; Magnetic measurements; Energy measurement; Helium; Magnetic field measurement; Magnets; Production; Refrigeration; Resistors; Superconducting coils; Time measurement; Voltage;
         
        
        
            Journal_Title : 
Magnetics, IEEE Transactions on
         
        
        
        
        
            DOI : 
10.1109/TMAG.1979.1060220