  • Abstract
    Remedial action schemes which respond to disturbance situations on the transmission network provide the transmission planner with an alternative means of improving system reliability and satisfying system design standards. A remedial action scheme based on a combination of momentary fast valving and generator tripping has been evaluated, implemented and tested by the Nebraska Public Power District in conjunction with its Gerald Gentleman Station. This scheme has enhanced system operating flexibility, provided the necessary reliability margins to comply with system design standards, and eliminated the need for costly generation reductions during prior transmission outage situations
  • Keywords
    electric generators; power stations; power systems; reliability; valves; Gerald Gentlemen Station; Nebraska Public Power District; fast valving; generator tripping; reliability; remedial action scheme; transmission network; transmission outage situations; Irrigation; Power generation; Power generation economics; Power markets; Power system interconnection; Power system planning; Power system reliability; Reservoirs; Senior members; Testing;