DocumentCode
983667
Title
An analysis of EDF schedulability on a multiprocessor
Author
Baker, Theodore P.
Author_Institution
Dept. of Comput. Sci., Florida State Univ., Tallahassee, FL, USA
Volume
16
Issue
8
fYear
2005
Firstpage
760
Lastpage
768
Abstract
A new schedulability test is derived for preemptive deadline scheduling of periodic or sporadic real-time tasks on a single-queue m-server system. The new test allows the task deadline to be more or less than the task period, and is based on a new analysis concept, called a μ-busy interval. This generalizes a result of Goossens et al. [2003] that a system of periodic tasks with maximum individual task utilization umax is EDF-schedulable on m processors if the total utilization does not exceed m(1 max)+umax. The new test allows the analysis of hybrid EDF-US [x] scheduling, and the conclusion that EDF-US[1/2] is optimal, with a guaranteed worst-case schedulable utilization of (m +1)/2.
Keywords
multiprocessing systems; processor scheduling; real-time systems; multiprocessor scheduling; multiprocessor system; preemptive deadline scheduling; real-time scheduling; single-queue m-server system; Multiprocessing systems; Processor scheduling; Real time systems; Scheduling algorithm; System testing; Multiprocessor systems; deadline scheduling; earliest deadline first; feasibility; multiprocessor scheduling.; real-time scheduling; utilization;
fLanguage
English
Journal_Title
Parallel and Distributed Systems, IEEE Transactions on
Publisher
ieee
ISSN
1045-9219
Type
jour
DOI
10.1109/TPDS.2005.88
Filename
1458691
Link To Document