DocumentCode
988952
Title
Shunting of Track Circuit in a Polyphase System of Continuous Inductive Train Control
Author
Estwick, C.F.
Author_Institution
Electrical Engineer, General Railway Signal Co., Rochester, N. Y.
Volume
47
Issue
4
fYear
1928
Firstpage
1034
Lastpage
1043
Abstract
Investigations into shunting of train control track circuits have been made in the field under operating conditions by observing the operation of the primary relay on a locomotive as a train runs into a track circuit in which there is a train ahead or an open switch and similar data have been obtained on the performance of the relay on trains in regular service. It is intended in this paper to present a method for predetermining the shunting characteristics of train control track circuits. The system discussed is a polyphase system of continuous inductive train control with cab signals employed on double tracked steam roads. Curves are given which describe shunting conditions in train control track circuits and data are also given for comparison describing the shunting of the track relay on the same sections of track.
Keywords
Automatic control; Contacts; Control systems; Impedance; Rail transportation; Railway engineering; Relays; Roads; Switches; Switching circuits;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1928.5055098
Filename
5055098
Link To Document