• DocumentCode
    988952
  • Title

    Shunting of Track Circuit in a Polyphase System of Continuous Inductive Train Control

  • Author

    Estwick, C.F.

  • Author_Institution
    Electrical Engineer, General Railway Signal Co., Rochester, N. Y.
  • Volume
    47
  • Issue
    4
  • fYear
    1928
  • Firstpage
    1034
  • Lastpage
    1043
  • Abstract
    Investigations into shunting of train control track circuits have been made in the field under operating conditions by observing the operation of the primary relay on a locomotive as a train runs into a track circuit in which there is a train ahead or an open switch and similar data have been obtained on the performance of the relay on trains in regular service. It is intended in this paper to present a method for predetermining the shunting characteristics of train control track circuits. The system discussed is a polyphase system of continuous inductive train control with cab signals employed on double tracked steam roads. Curves are given which describe shunting conditions in train control track circuits and data are also given for comparison describing the shunting of the track relay on the same sections of track.
  • Keywords
    Automatic control; Contacts; Control systems; Impedance; Rail transportation; Railway engineering; Relays; Roads; Switches; Switching circuits;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1928.5055098
  • Filename
    5055098