  • Abstract
    The one-TeV proton synchrotron which has been under construction at Fermilab is nearly complete and is now entering the commissioning phase. The assembly and testing of the ring of more than 1000 superconducting magnets with its associated cryogenic, vacuum, power, R.F., controls and safety systems has gone extremely well.
  • Keywords
    Accelerator magnets, superconducting; Proton synchrotrons; Accelerator magnets; Apertures; Packaging; Particle beams; Protons; Structural beams; Superconducting cables; Superconducting magnets; Synchrotrons; Testing;
  • fLanguage
    English
  • Journal_Title
    Magnetics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9464
  • Type

    jour

  • DOI
    10.1109/TMAG.1983.1062248
  • Filename
    1062248