992680
Title :
Status of the energy saver
Author :
Orr, J.R.
Author_Institution :
Fermi National Accelerator Laboratory, Batavia, IL
Volume :
19
Issue :
3
fYear :
1983
fDate :
5/1/1983 12:00:00 AM
Firstpage :
195
Lastpage :
197
Abstract :
The one-TeV proton synchrotron which has been under construction at Fermilab is nearly complete and is now entering the commissioning phase. The assembly and testing of the ring of more than 1000 superconducting magnets with its associated cryogenic, vacuum, power, R.F., controls and safety systems has gone extremely well.
Keywords :
Accelerator magnets, superconducting; Proton synchrotrons; Accelerator magnets; Apertures; Packaging; Particle beams; Protons; Structural beams; Superconducting cables; Superconducting magnets; Synchrotrons; Testing;
fLanguage :
English
Journal_Title :
Magnetics, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9464
Type :
jour
DOI :
10.1109/TMAG.1983.1062248
Filename :
1062248
Link To Document :
بازگشت