Status of the energy saver
Author
Orr, J.R.
Author_Institution
Fermi National Accelerator Laboratory, Batavia, IL
Volume
19
Issue
3
fYear
1983
fDate
5/1/1983 12:00:00 AM
Firstpage
195
Lastpage
197
Abstract
The one-TeV proton synchrotron which has been under construction at Fermilab is nearly complete and is now entering the commissioning phase. The assembly and testing of the ring of more than 1000 superconducting magnets with its associated cryogenic, vacuum, power, R.F., controls and safety systems has gone extremely well.
Keywords
Accelerator magnets, superconducting; Proton synchrotrons; Accelerator magnets; Apertures; Packaging; Particle beams; Protons; Structural beams; Superconducting cables; Superconducting magnets; Synchrotrons; Testing;
fLanguage
English
Journal_Title
Magnetics, IEEE Transactions on
Publisher
ieee
ISSN
0018-9464
Type
jour
DOI
10.1109/TMAG.1983.1062248
Filename
1062248
Link To Document