Title :
Status of the energy saver
Author_Institution :
Fermi National Accelerator Laboratory, Batavia, IL
fDate :
5/1/1983 12:00:00 AM
Abstract :
The one-TeV proton synchrotron which has been under construction at Fermilab is nearly complete and is now entering the commissioning phase. The assembly and testing of the ring of more than 1000 superconducting magnets with its associated cryogenic, vacuum, power, R.F., controls and safety systems has gone extremely well.
Keywords :
Accelerator magnets, superconducting; Proton synchrotrons; Accelerator magnets; Apertures; Packaging; Particle beams; Protons; Structural beams; Superconducting cables; Superconducting magnets; Synchrotrons; Testing;
Journal_Title :
Magnetics, IEEE Transactions on
DOI :
10.1109/TMAG.1983.1062248