Title :
A case study of Abnormal Conditions and Events (ACE) analysis
Author :
Reeves, R. ; Hicks, G. ; Karrasch, B.
Author_Institution :
Tennessee Valley Authority, Chattanooga, TN, USA
fDate :
8/1/1995 12:00:00 AM
Abstract :
In August of 1993, EPRI initiated a project to perform an evaluation of the application of various methodologies for performing Abnormal Conditions and Events (ACE) analysis on computer systems used in nuclear plants. This paper discusses the application of ACE analysis techniques to two systems designed for the Tennessee Valley Authority Browns Ferry nuclear plant. Further details can be obtained from EPRI TR-104595, “Abnormal Conditions and Events Analysis for Instrumentation and Controls Systems” which is scheduled for publication in December, 1994
Keywords :
computerised control; fission reactor safety; nuclear engineering computing; nuclear power stations; ACE analysis; Abnormal Conditions and Events Analysis; Browns Ferry nuclear plant; computer systems; containment isolation status system; nuclear plants; reactor feedwater control system; Application software; Computer aided software engineering; Control systems; Hardware; Inductors; Logic functions; Performance evaluation; Safety devices; Signal processing; Software safety;
Journal_Title :
Nuclear Science, IEEE Transactions on