DocumentCode :
995186
Title :
Electricity´s Part in Open Cut Copper Mining
Author :
Corfield, R.J.
Author_Institution :
Asst. Elec. Eng., Utah Copper Co., Garfield, Utah.
Volume :
50
Issue :
1
fYear :
1931
fDate :
3/1/1931 12:00:00 AM
Firstpage :
106
Lastpage :
112
Abstract :
This paper is intended to describe the electrification of the world´s largest open cut copper mine, and also covers briefly main line transportation and miscellaneous uses of electrical energy at the concentrating plants, that are located approximately 18 miles from the mine. This electrification project was an economical and progressive step in copper mining and developed some very interesting engineering problems. Electric shovels, both alternating and direct current, together with the special type of electrical locomotive required for this particular service, are discussed. The rather elaborate trolley and feeder system required to transmit power to a fleet of 23 electric shovels and 39 electric locomotives, scattered over a 725-acre area, is described. The main power system, together with mill, railway and shovel substations, is briefly described. Some operating statistics are given, to assist in visualizing the magnitude of the operations.
Keywords :
Milling machines; Power engineering and energy; Power generation economics; Power system economics; Power systems; Rail transportation; Scattering; Statistics; Substations;
fLanguage :
English
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
Publisher :
ieee
ISSN :
0096-3860
Type :
jour
DOI :
10.1109/T-AIEE.1931.5055749
Filename :
5055749