Title :
Reestablishing Excitation of a Loaded Alternator in Parallel with Others
Author :
Higgins, D.D. ; Wild, E.
Author_Institution :
Electrical Asst. to Supt. of Generating Stations.
Abstract :
The paper describes operating tests with large turbo generators under load and gives a r??sum?? of answers to a questionnaire, bearing on the phenomena accompanying the interruption of the direct-current excitation supply, followed by reclosing after a short interval. The object of the investigation was to determine, if possible, a reasonably safe operating procedure that could be followed in reestablishing normal conditions on a large turbo generator whose excitation had been interrupted while carrying load. The authors conclude that the reexcitation of a generator without withdrawing it from the bus is a justifiable and safe operating procedure and the one that will restore all conditions to normal in the shortest time. These conclusions have been verified by twelve prearranged tests, five ``experiences´´ in the local company and seventeen ``experiences´´ by other companies. In all of these cases the field switches have been reclosed without trouble of any kind.
Keywords :
Alternators; Hydroelectric power generation; Manufacturing processes; Power generation; Switches; Switching circuits; Testing; Turbogenerators;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1931.5055941