محاسبه ضريب بهره وري و نرخ پيشروي دستگاه حفاري تمام مقطع TBM در سنگهاي سخت مطالعه موردي: قطعه 1 تونل انتقال آب قمرود
عنوان به زبان ديگر :
Calculation of Utilization Factor and Advance Rate for Full Face Tunnel Boring
Machine (TBM) in Hard Rocks,
Case Study: Qomroud Water Transfer Tunnel Lotl
پديد آورندگان :
شريعت علوي، حسين نويسنده شركت سابير,; Shariat Alavi, H. , كاكايي، رضا نويسنده دانشگاه صنعتي شاهرود,دانشكده مهندسي معدن،نفت و ژئوفيزيك; Kakaei, R. , زورآبادي، مهدي نويسنده شركت علوم زمين پارس,; Zoorabadi, M. , عليزاده صوري، بهزاد نويسنده دانشگاه آزاد اسلامي علوم و تحقيقات,; Alizadeh Sevari, B. , عبداللهي، مهدي نويسنده شركت سابير,; Abdollahi, M.
اطلاعات موجودي :
دوفصلنامه سال 1389 شماره 9
كليدواژه :
حفاري مكانيزه , بهره وري , تونل قمرود , NTH , CSM , مدل جديد
چكيده لاتين :
Qomroud Tunnel with the length of 35.7 kilometers is one of the greatest national projects. EPB type tunneling machine has been selected for boring of lot 1 with the length of 11+311 kilometers. Prediction of utilization factor is very important for prediction of advance rate and afterward project complete time and costs. Utilization factor is defined as the machine boring time net divided by the available total time of each geology unit. This factor is depends on geology conditions, machine type, back up installations, project management and finally workerʹs experience. The NTH and CSM methods are the most important methods that are used for prediction of utilization factor in countries. In this article a method which has the closer values to actual utilization factors has been presented for achievement to utilization factors. Then TBM utilization factor has been predicted for each tunnel path geology unit by three ways and has been compared with actual data for 4570 meter length which has been bored and then tunnel boring accomplishment time has been predicted. The goal of the article is representation of a model for so accurate estimation of utilization factors and finally correct decision of project scheduling and the income and cost prediction in TBM excavation projects.