عنوان مقاله :
ارايه روشي جهت تعيين اندازه بافرها در حوزه زمان بندي زنجيره بحراني )مطالعه موردي: شركت سوليران(
عنوان فرعي :
(Providing a Method to Buffer Sizing Determination in Critical Chain of Project Scheduling (Case Study: Suliran Co
پديد آورندگان :
توقع همداني، محمد مهدي نويسنده كارشناس ارشد دانشگاه آزاد واحد علوم و تحقيقات Tavagho Hamedani, Mohammad Mehdi , ماكويي ، احمد نويسنده ,
اطلاعات موجودي :
فصلنامه سال 1390 شماره 17
كليدواژه :
زمان بندي پروژه , روشهاي تعيين اندازه بافر , زنجيره بحراني , شركت سوليران
چكيده فارسي :
زنجيره بحراني رويكردي نوين در حوزه مديريت پروژه مي باشد كه به منظور رفع اثرات نامطلوب پروژه ها و علل بروز آنها، افزايش كارايي منابع و بهره برداري از محدوديتهاي سيستم پروژه توسعه يافته است. بر مبناي اين رويكرد و به منظور ايمن كردن پروژه در مقابل اختلالات احتمالي، بافرهاي زماني در محلهاي مختلف تعبيه ميشود. بنابراين از انتقال تنشهاي فعاليتهاي غير بحراني به زنجيره بحراني و همچنين انتقال تنشهاي فعاليتهاي زنجيره بحراني به زمان تحويل پروژه جلوگيري ميشود. در اين مقاله روشي جهت تعيين اندازه بافرها در حوزه زمانبندي زنجيره بحراني ارايه شده كه از جمله ويژگي هاي آن اعمال نظر خبرگان در مراحل كار و سادگي اجرا ميباشد. مفاهيم مطرح شده در اين روش نزديك به روش پرت مي باشد با اين تفاوت كه در اين روش تابع توزيع احتمال زمان فعاليتها براساس نظرات خبرگان بدست آمده است. در پايان جهت ارزيابي روش پيشنهادي، زنجيره بحراني جهت پروژه طراحي، ساخت و نصب سازه اي فولادي در شركت سوليران به اجرا درآمد. اندازه بافرها با استفاده از دو روش شناخته شده در ادبيات موضوع (روش بريدن و چسباندن و روش ريشه مربع خطا) و روش پيشنهادي محاسبه گرديد. نتايج بدست آمده مبين آن است كه روش ارايه شده در مقايسه با دو روش مذكور بافرهايي با محافظت بيشتر در برابر تاخيرهاي احتمالي پروژه ايجاد ميكند.
چكيده لاتين :
Abstract:
The critical chain is a novel approach in the domain of project management
which has been developed to eliminate projects unfavorable impacts and their
reasons. Also, it is used to increase resources performance and to utilize
restrictions of project system. To secure project against probable disturbances
time buffers were installed in different areas based on this approach. Thus,
tensions of uncritical activities were kept to be transferred to critical chain and
tensions of critical chain activities were prevented as well to be transmitted to
project delivery time. In the present paper, a method to determine buffers size in
the domain of critical chain was presented. The method fortified with such main
characteristics as applying experts ideas throughout the work steps, as well as
simple implementing process. Even though, the concepts proposed in this
method are close to Pert method, the distribution function of activities time
probability in the method was obtained according to experts ideas. Finally, the
critical chain was conducted for designing, constructing, and installing of a steel
structure in Suliran Company to assess the suggested method. Buffers size were
estimated using two recognized methods in literatures, Cut and Paste (C&P)
method, Root Square Error (RSE) method and the proposed method. Comparing
with two mentioned methods, the presented method, as obtained results display,
generates buffers with more protection against projectʹs probable delays
Keywords: Project scheduling, Critical chain, Buffer sizing methods.
عنوان نشريه :
پژوهش در مديريت صنعتي - دانشگاه آزاداسلامي واحد سنندج
عنوان نشريه :
پژوهش در مديريت صنعتي - دانشگاه آزاداسلامي واحد سنندج
اطلاعات موجودي :
فصلنامه با شماره پیاپی 17 سال 1390
كلمات كليدي :
#تست#آزمون###امتحان