Title of article :
Possible ecological consequences from the Sethu Samudram Canal Project, India
Author/Authors :
D.V. Subba Rao، نويسنده , , K. Srinivasa Rao، نويسنده , , C.S.P. Iyer، نويسنده , , P. Chittibabu ، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2008
Pages :
17
From page :
170
To page :
186
Abstract :
The Sethu Samudram Canal Project (SSCP), considered as a harbinger of economic growth in India, is a mega engineering project being developed to provide a 260 km long, 300 m wide and 12 m deep shipping channel between the Arabian Sea and the Bay of Bengal. This project impacts the unique biota and biodiversity of a 10,500 km2 Marine Biosphere Reserve. This man-made link facilitates exchange of water masses between the less saline Bay of Bengal and the more saline Arabian Sea. Initial construction, subsequent dredging for channel maintenance, and the associated ship traffic would result in irreversible changes to the already over-exploited and stressed environment. Additionally, the channel would form a deep ocean route for future tsunamis. However, to provide assurance to the public, particularly the 50,000 fishing folk, in 47 villages in this area, it would be crucial that a long-term environmental monitoring program is instituted. A thorough evaluation of the impending environmental impacts, similar to those addressed by a Before/After and Control/Impact (BACI model) is recommended.
Keywords :
tsunamis , India–Sri Lanka region , Mega-engineering shipping channel , Environmental impacts
Journal title :
Marine Pollution Bulletin
Serial Year :
2008
Journal title :
Marine Pollution Bulletin
Record number :
1296275
Link To Document :
بازگشت