Title of article :
Optimizing schedule for improving the traffic impact of work zone on roads
Author/Authors :
Lee، نويسنده , , Hsin-Yun، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
11
From page :
1034
To page :
1044
Abstract :
Many different types of construction projects set up work zones on roads. Especially in urban areas, lane closures as a result of work zones have a considerable impact on local traffic. However, for a construction project that consists of several work zones and several work crews, the traffic impact may be improved by appropriate scheduling. Therefore, this paper proposed a scheduling model based on the route-changing behavior of road users. The proposed model calculates the traffic delay of vehicles by microscopic simulation, and applies team ant colony optimization to search for a near-optimal schedule. The project planner then ensures that the contractor executes the activities according to the near-optimal schedule. The proposed model is applied to schedule a sewer system construction project in a city. The results of our study indicate that with our proposed model the total traffic delay is reduced by 11.1% when compared with a schedule proposed by the project planner.
Keywords :
work zone , Traffic impact , Road user behavior , Ant Colony Optimization , Microscopic Simulation
Journal title :
Automation in Construction
Serial Year :
2009
Journal title :
Automation in Construction
Record number :
1338128
Link To Document :
بازگشت