Title of article :
The Longest Path Problem in Fuzzy Project Networks: A Case Study
Author/Authors :
El-Santawy، Mohamed F. نويسنده Institute of Statistical Studies and Research (ISSR),Department of Operations Research,Cairo University,Cairo,Egypt , , Abd-Allah، Soha M. نويسنده Institute of Statistical Studies and Research (ISSR),Department of Operations Research,Cairo University,Cairo,Egypt ,
Issue Information :
ماهنامه با شماره پیاپی سال 2011
Abstract :
In This article a real-life international construction and building project network problem is presented, the problem of identifying the critical path of the
project within fuzzy parameters (the longest path) is formulated by applying a
linear programming approach which incorporates the concept of α-cuts into two
(primal and dual) models. In order to determine the solution a code was
developed to solve 22 linear programming models that had been constructed at
different α-cuts during formulation. Yager’s ranking method is applied to
compare all paths, and determining the time of the longest one.
Keywords :
critical path , Construction & Building , , Linear
Programming , Project Management , Fuzzy CPM
Journal title :
General Mathematics Notes
Journal title :
General Mathematics Notes