    Late work minimization in a small flexible manufacturing system

  • Author/Authors

    Malgorzata Sterna، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2007
  • Pages
    19
  • From page
    210
  • To page
    228
  • Abstract
    The paper concerns a small flexible manufacturing system consisting of three CNC machines: a lathe machine, milling machine and measurement center and a single robot, located at the Poznań University of Technology. A short description of the production environment, which can be modeled as the extended job shop system with open shop sections within particular jobs, is followed by the proposition of a branch and bound method. It optimizes production plans within a single shift in order to minimize the late work, i.e. the amount of work executed after a given due date. Based on results of computational experiments, conclusions are formulated on the efficiency of the B&B algorithm and on the behavior of FMS under consideration.
  • Keywords
    Shop scheduling , Flexible manufacturing system , Branch and bound algorithm , Late work criterion
  • Journal title
    Computers & Industrial Engineering
  • Serial Year
    2007
  • Journal title
    Computers & Industrial Engineering
  • Record number

    925495