• Title of article

    A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time

  • Author/Authors

    Ghaith Rabadia;، نويسنده , , Mansooreh Mollaghasemib، نويسنده , , Georgios C. Anagnostopoulosc، نويسنده ,

  • Issue Information
    دوهفته نامه با شماره پیاپی سال 2004
  • Pages
    25
  • From page
    1727
  • To page
    1751
  • Abstract
    The single-machine early/tardy (E/T) scheduling problem is addressed in this research. The objective of this problem is to minimize the total amount of earliness and tardiness. Earliness and tardiness are weighted equally and the due date is common and large (unrestricted) for all jobs. Machine setup time is included and is considered sequence-dependent. When sequence-dependent setup times are included, the complexity of the problem increases signi2cantly and the problem becomes NP-hard. In the literature, only mixed integer programming formulation is available to optimally solve the problem at hand. In this paper, a branch-and-bound algorithm (B&B) is developed to obtain optimal solutions for the problem. As it will be shown, the B&B solved problems three times larger than what has been reported in the literature.
  • Keywords
    branch-and-bound , Single-machine scheduling , Earliness/Tardiness , Common due date , Early/tardy , sequence-dependent setup times