    Measuring the environmental costs of tidal power plant construction: A choice experiment study

  • Author/Authors

    Joo-Suk Lee، نويسنده , , Seung-Hoon Yoo، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2009
  • Pages
    6
  • From page
    5069
  • To page
    5074
  • Abstract
    Korea is considering the construction of a tidal power plant (TPP) at Garolim Bay. However, as the construction of the Garolim TPP (GTPP) is expected to entail some environmental damage, it has become an increasingly important topic for public debate. Using a choice experiment (CE) approach, this study attempts to measure the economic cost that results from the environmental damage caused by the construction of GTPP. The CE is used to measure the environmental costs of individual attributes, including the reduction in the area of the tidal flat, the degradation of seawater quality, and the destruction of marine life. The results indicate that the annual willingness to pay (WTP) per household for mitigating the environmental damage that results from the worst-possible situation in relation to the present situation is about 96,042 Korean won (USD 101.1) in the seven biggest cities (off-site regions) and 18,584 Korean won (USD 19.6) in Seosan and Taean (on-site regions). This study is expected to provide policy-makers with quantitative information that will be useful to decide whether or not GTPP should be constructed.
  • Keywords
    Environmental cost , Tidal power plant , Choice experiment
  • Journal title
    Energy Policy
  • Serial Year
    2009
  • Journal title
    Energy Policy
  • Record number

    972964