Time-Cost Trade-off Problem in Construction Project Management, Based on Fuzzy Logic
پديد آورندگان
Abbasnia R نويسنده , Afshar A نويسنده , Eshtehardian E نويسنده
از صفحه
4159
تا صفحه
4165
تعداد صفحه
7
چكيده لاتين
In this study, a new approach has been investigated in solving time-cost trade off problem, because of uncertainties which affect on activity cost. Fuzzy logic theory is employed to consider affecting uncertainties
in total direct and indirect cost of a construction project. Non-dominated Sorting Genetic Algorithm (NSGA), a multi objective optimization algorithm, is applied to provide a trade-off between time and total cost. Project manager can also have different non-dominated solutions or pareto solutions which are dependent on his measure of accepted risk through applying a cuts methods in fuzzy logic theory. The proposed model leads the decision maker to select the desirable pareto front solution through acceptable value of alpha cut.
شماره مدرك
1204738
لينک به اين مدرک