شماره ركورد كنفرانس :
3358
عنوان مقاله :
INVESTIGATION OF CONSTRUCTION METHODS OF WET CORE EARTH DAMS IN WET CLIMATES
Author/Authors :
S. GHANOONI MAHABADI Head of soil and rock mechanics section - Mahab Ghodss Consulting Engineers , M. JAHANANDISH Civil Engineering Department - Shiraz University , J. JALILI Civil engineering department - Shiraz University
كليدواژه :
Wet construction , Moist material , Wet clay , Wet core , Wet compaction
عنوان كنفرانس :
73rd Annual Meeting of ICOLD
چكيده لاتين :
Building embankment dams in areas with wet climate and no considerable dry season has some
problems, the most important of which is the core material compaction. As core is the impervious part
of the dam, fine grain materials, including clayey soils with low permeability, are the first choice. But
the finer the material, the more difficult is its compaction in wet areas, especially if it is not possible
to dry the soil due to continued rainfall and humid weather. Common heavy compactors sink in these
wet soils and are not able to gain the Proctor standard factors and compaction effort. So the standard
tests and compactors are not practical in these cases. This article contains a literature review of the
trends which have successfully been used in this regard. Countries like Japan, Sweden and England
are of those which have wet climates and are well experienced in this subject, these experiences are
pointed out briefly, in addition to some case studies of old and recent dams built with wet construction
methods all over the world.