شماره ركورد كنفرانس :
3386
عنوان مقاله :
Flexible job shop scheduling problem with preventive maintenance tasks and work in process constraint
Author/Authors :
Nona Rezvani Industrial Engineering Dept - School of Engineering Tarbiat Modares University Tehran , Hessameddin Zegordi Industrial Engineering Dept - School of Engineering Tarbiat Modares University Tehran , Ali Hossein Zadeh Kashan Industrial Engineering Dept - School of Engineering Tarbiat Modares University Tehran
كليدواژه :
Flexible Job Shop Scheduling , Preventive maintenance , WIP , Release Times , Earliness Tardiness Penalties
سال انتشار :
شهريور 1394
عنوان كنفرانس :
كنفرانس بين المللي مهندسي صنايع و سيستم ها
زبان مدرك :
انگليسي
چكيده لاتين :
In This study an FJSP with unavailability periods in terms of preventive maintenance tasks, due dates, release times and WIP1 constraint is investigated. The problem is based on a real job shop so due to its nature, a mathematical model is developed for it and the nonlinear equations changed to linear ones. For verification of the modeling, it is solved using GAMS and four instances from literature with extra information, which has been improvised.
كشور :
ايران
تعداد صفحه 2 :
7
از صفحه :
339
تا صفحه :
345
لينک به اين مدرک :
بازگشت