شماره ركورد كنفرانس :
4873
عنوان مقاله :
Reliability Based Spare Parts Provision (Case Study: Jajarm Bauxite Mine)
پديدآورندگان :
Barabadi Reza Rreza.barabadi@yahoo.com Shahrood University of Technology , Ataei Mohammad ataei@shahroodut.ac.ir Shahrood University of Technology , Khalokakaie Reza R_kakaie@shahroodut.ac.ir Shahrood University of Technology , Nouri Gharahasanlou Ali Alinoorimine@gmail.com Shahrood University of Technology , Aliyari Mostafa mostafa.aliyari@mail.polimi.it Politecnico di Milano
تعداد صفحه :
13
كليدواژه :
Spare part , Reliability , Covariates , Jajarm Bauxite mine
سال انتشار :
1398
عنوان كنفرانس :
اولين همايش ملي مديريت ريسك و تاب آوري در صنايع معدني
زبان مدرك :
انگليسي
چكيده فارسي :
Spare parts provision is a complex problem and requires an accurate model to analysis all factors that may affect the required number of spare parts. The number of spare parts required for an item can be effectively estimated based on its reliability performance. The reliability characteristics of an item are influenced by different factors such as the operational environment, maintenance policy, operator skill, etc. However, in the majority of reliability-based, spare parts provision (RSPP) studies, the effect of these influence factors has not been considered, and the only variable of interest is the operating time. Hence, the statistical approach selected for reliability performance analysis must be able to handle the effect of these factors. One of the important models for reliability performance analysis that takes influence factors into account is the proportional hazard model (PHM), which has received less attention in the field of spare parts provisioning. This approach considers of reliability (RRMC) for time independent and dependent covariates. The aim of this paper is to demonstrate the application of the available reliability models with covariates in the field of spare part predictions by means of a case study. The proposed approach was evaluated with data from the system of fleet loading of Jajarm Bauxite mine, Iran consisting of 5 Crane shovels. The outputs represent a significant difference in the required spare parts forecasting and inventory management when considering and ignoring covariates.
كشور :
ايران
لينک به اين مدرک :
بازگشت