شماره ركورد كنفرانس :
5432
عنوان مقاله :
A Best-Worth Method to Implement Bi-lateral Contracts with Essential Barriers
پديدآورندگان :
Einy-Sarkalleh Gholamreza gh_einy@yahoo.com Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran , Tavakkoli-Moghaddam Reza tavakoli@ut.ac.ir School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran , Najafi Esmaeel e.najafi@srbiau.ac.ir Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran
تعداد صفحه :
5
كليدواژه :
Bi , direction contract , Best , worth method , Coordination , Cooperation , alliance.
سال انتشار :
1402
عنوان كنفرانس :
شانزدهمين كنفرانس بين المللي انجمن ايراني تحقيق در عمليات
زبان مدرك :
انگليسي
چكيده فارسي :
In some bi-lateral alliances, firms coordinate their interactions in supply chain management (SCM) via contracts. Although such a contractual approach is common in the community of SCM both in industry and academia, successful implementation of contracts in bi-lateral alliances remains challenging in practice because of the incomplete identification of implementation barriers by firms involved in the alliance. This paper investigates the implementation issues of bi-lateral contracts. To identify the barriers, the literature and interview experts of the subject matter are reviewed. By adopting the novel “best-worst” prioritization method, we evaluate the main barriers firms face in the successful implementation of contracts discovered in our identification phase. To validate the findings, a list of barriers is applied to assess a set of firms in the Iranian auto industry and locate more prepared firms as future partners of potential bi-lateral alliances. The results are consistent with the common intuition toward these sample firms in the case study.
كشور :
ايران
لينک به اين مدرک :
بازگشت