    Conditions Controlling the Economic Selection of Prime Movers

  • Author

    Skrotzki, Bernhardt G.A.

  • Author_Institution
    Assistant engineer, system engineering department, Consolidated Edison Company of New York, Inc., New York, N. Y.
  • Volume
    63
  • Issue
    12
  • fYear
    1944
  • Firstpage
    1099
  • Lastpage
    1108
  • Abstract
    This paper attempts to clarify the effect of various controlling conditions on the magnitude of the evaluation constants used to select the optimum prime mover to be added to a system with a growing load. A hypothetical load has been set up which is assumed to grow at a known constant rate. Fixing on a policy of equal-sized units, two-unit installed reserve, and one-unit operating reserve regardless of load magnitude the progress of the individual generating units from the base to the top of the load curve can be readily studied. With the fundamental mechanics of the problem delineated the effects of unit availability, unit life span, rate of load growth, load cycle, load factor, unit capacity, and system reserve policy are analyzed. From this analysis certain principles are apparent, among the most important being: 1. Historical data of past and present prime-mover experience are of very limited value. 2. Evaluation constants for future prime movers are not fixed in magnitude and must be redetermined from time to time for each individual system. Having demonstrated the relative importance of the various controlling conditions this work is concluded with a recommended procedure for determining the evaluation constants for any practical case.
  • Keywords
    Availability; Control systems; Costs; Difference equations; Investments; Power generation economics; Protons; Tellurium;
  • fLanguage
    English
  • Journal_Title
    American Institute of Electrical Engineers, Transactions of the
  • Publisher
    ieee
  • ISSN
    0096-3860
  • Type

    jour

  • DOI
    10.1109/T-AIEE.1944.5058853
  • Filename
    5058853