DocumentCode
1027103
Title
Determination or Reserve Requirements or Two Interconnected Systems
Author
Cook, V.M. ; Steinberg, M.J. ; Galloway, C.D. ; Wood, A.J.
Author_Institution
Consolidated Edison Company of New York, Inc.
Volume
82
Issue
65
fYear
1963
fDate
4/1/1963 12:00:00 AM
Firstpage
18
Lastpage
33
Abstract
The interconnection of two power systems offers the opportunity to achieve an appreciable gain in the reliability of the two generation systems and planned economies as a result of capacity sharing. Use of the probabilistic methods described permits evaluation of these reliability and reserve benefits. The methods described extend the single system probability techniques to two interconnected systems. A digital computer program has been developed to implement these methods.
Keywords
Capacity planning; Interconnected systems; Maintenance; Power generation; Power markets; Power system economics; Power system interconnection; Power system planning; Power system reliability; Probability;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1963.291394
Filename
4072759
Link To Document