• DocumentCode
    1027896
  • Title

    Pre-screening of single contingencies causing network topology changes

  • Author

    Brandwajn, V. ; Liu, Y. ; Lauby, M.G.

  • Author_Institution
    ABB Power Autom., Palo Alto, CA, USA
  • Volume
    6
  • Issue
    1
  • fYear
    1991
  • fDate
    2/1/1991 12:00:00 AM
  • Firstpage
    30
  • Lastpage
    36
  • Abstract
    A multilevel contingency screening method is introduced to process large sets of candidate power system contingencies. The idea is to apply a series of increasingly more accurate and time-consuming algorithms so that each higher screening level processes a reduced set of candidates. A practical implementation of the method uses a fast prescreening step whose algorithm is based upon the local network solution concept. The method is designed to process contingencies whose effects can be localized, e.g. branch outages and bus section faults. The accuracy of the new algorithm is controlled via an automatically calculated small network adequacy ratio while its reliability is enhanced by the use of different contingency severity measures
  • Keywords
    electrical faults; power system analysis computing; reliability; algorithms; branch outages; bus section faults; fast prescreening step; local network solution concept; multilevel contingency screening method; network topology; power system analysis computing; reliability; Automatic control; Automation; Control systems; Design methodology; Energy management; Medical services; Network topology; Process design; Senior members; Stress measurement;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.131044
  • Filename
    131044