Title :
Rapid Reversal of San Luis Pumping - Generating Units
Author :
Stroh, Raymond G. ; Seitz, Bradley G. ; Lloyd, Lester W., Jr.
Author_Institution :
Bureau of Reclamation
fDate :
7/1/1970 12:00:00 AM
Abstract :
The changeover of a reversible pump¿generating unit from full-load pumping to full-load generating has been accomplished in the unusually short time of 27 seconds. Comparison of this mode of operation, called rapid reversal, to more usual operations is made and control details are outlined. Application of this mode of operation can improve the contribution of a pumping¿generating plant during power system emergencies.
Keywords :
Design engineering; Frequency; Power engineering and energy; Power generation; Power systems; Proposals; Stress; Testing; Valves; Water storage;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1970.292700