Title :
Nuclear Power Plant Environmental Reports
Author :
Robinson, M. John ; Smith, Earl O.
Author_Institution :
Black & Veatch, Consulting Engineers
Abstract :
This paper dtscusses the environmental report requirements for nuclear power plant construction and operating permits. The current guidance furnished by the Atomic Energy Commission is discussed and the implications regarding timing and possible criticisms by the public are pointed out. Examples from current licensing and permit hearings are discussed in the context of how to minimize the conflicts that might arise.
Keywords :
Auditory system; Cities and towns; Cooling; Councils; Guidelines; Licenses; Meeting planning; Power engineering and energy; Power generation; Timing;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1974.293949