DocumentCode :
1052203
Title :
525-kV Self-Contained Oil-Filled Cable Systems for Grand Coulee Third Powerplant Design and Development
Author :
Ray, J.J. ; Arkell, C.A. ; Flack, H.W.
Author_Institution :
Bureau of Reclamation
Issue :
2
fYear :
1974
fDate :
3/1/1974 12:00:00 AM
Firstpage :
630
Lastpage :
639
Abstract :
The more important requirements, and the design features developed to meet these requirements, are discussed in detail for the first three 525-kV oil-filled underground cable systems to be installed for the transformer circuits at Grand Coulee Third Powerplant. The cable systems will bq of the self-contained type and will be energized in 1974, the first at this voltage for commercial operation in the U.S.A. Consideration of unusual parameters such as the 600 feet (183 meters) elevation difference between terminals, installation in a 6-foot (1.83-m) wide tunnel, ambient temperature range from minus 27°C to plus 45°C, 1,800-kV cable B.I.L., along with insulation and accessory requirements for 525 kV, provided many unique design features that will be applicable to other similar projects, in addition to those with less stringent requirements.
Keywords :
Cable insulation; Oil filled cables; Oil insulation; Power generation; Power generation economics; Power transformer insulation; Power transmission lines; Rivers; Switching circuits; Underground power cables;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1974.294025
Filename :
4075399
Link To Document :
بازگشت