• DocumentCode
    1065680
  • Title

    Risk-based resource optimization for transmission system maintenance

  • Author

    Jiang, Yong ; McCalley, James D. ; Van Voorhis, Tim

  • Author_Institution
    Iowa State Univ., Ames, IA
  • Volume
    21
  • Issue
    3
  • fYear
    2006
  • Firstpage
    1191
  • Lastpage
    1200
  • Abstract
    This paper describes a resource optimization approach for transmission system maintenance selection and scheduling that is based on the cumulative long-term risk caused by failure of each piece of equipment. This approach accounts for equipment failure probability, equipment damage, as well as outage consequence in terms of dispatch cost. A method of computing the change of equipment failure probabilities and expected time to failure when equipment condition data are available is described. The method is illustrated on a 566-bus model of a U.S. utility system
  • Keywords
    failure analysis; maintenance engineering; power transmission reliability; resource allocation; risk analysis; cumulative long-term risk; dispatch cost; equipment damage; equipment failure probability; outage consequence; risk-based resource optimization; transmission system maintenance; Costs; Equipment failure; Information security; Job shop scheduling; Power generation economics; Power system modeling; Power system reliability; Power system security; Power system simulation; Resource management; Maintenance; optimization; power system; reliability; risk; security; transmission equipment;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2006.879257
  • Filename
    1664954