DocumentCode
1065680
Title
Risk-based resource optimization for transmission system maintenance
Author
Jiang, Yong ; McCalley, James D. ; Van Voorhis, Tim
Author_Institution
Iowa State Univ., Ames, IA
Volume
21
Issue
3
fYear
2006
Firstpage
1191
Lastpage
1200
Abstract
This paper describes a resource optimization approach for transmission system maintenance selection and scheduling that is based on the cumulative long-term risk caused by failure of each piece of equipment. This approach accounts for equipment failure probability, equipment damage, as well as outage consequence in terms of dispatch cost. A method of computing the change of equipment failure probabilities and expected time to failure when equipment condition data are available is described. The method is illustrated on a 566-bus model of a U.S. utility system
Keywords
failure analysis; maintenance engineering; power transmission reliability; resource allocation; risk analysis; cumulative long-term risk; dispatch cost; equipment damage; equipment failure probability; outage consequence; risk-based resource optimization; transmission system maintenance; Costs; Equipment failure; Information security; Job shop scheduling; Power generation economics; Power system modeling; Power system reliability; Power system security; Power system simulation; Resource management; Maintenance; optimization; power system; reliability; risk; security; transmission equipment;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2006.879257
Filename
1664954
Link To Document