• DocumentCode
    1066746
  • Title

    Taiwan´s High-Tech Hubbub

  • Author

    Chiu, Yu-tzu

  • Volume
    43
  • Issue
    8
  • fYear
    2006
  • Firstpage
    16
  • Lastpage
    16
  • Abstract
    This paper looks at the controversy surrounding the construction of a bullet train that would go from the north end of Taiwan to the south. Aside from conflicting with plans for a new semiconductor manufacturing park in Tainan, the transportation project has also been plagued by allegations of irregularities, particularly in the manner by which the vibration mitigation contract was manipulated to favor certain individuals and how construction expenses appear to have been inflated. The high-speed railway is set to begin commercial operation in October 2006 - more than three years behind schedule
  • Keywords
    contracts; design engineering; railway engineering; rapid transit systems; vibration isolation; Democratic Progressive Party; Taiwan; barrier walls; bullet train; elastic rubber pellets; high-speed railway; transportation project; vibration mitigation contract; vibration reduction; Displays; Microelectronics; Semiconductor device manufacture;
  • fLanguage
    English
  • Journal_Title
    Spectrum, IEEE
  • Publisher
    ieee
  • ISSN
    0018-9235
  • Type

    jour

  • DOI
    10.1109/MSPEC.2006.1665049
  • Filename
    1665049