• DocumentCode
    1083708
  • Title

    25-Hz at Niagara Falls [History]

  • Author

    Blalock, Thomas J. ; Woodworth, C.A.

  • Volume
    6
  • Issue
    2
  • fYear
    2008
  • Firstpage
    78
  • Lastpage
    82
  • Abstract
    Part 1 of this article, published in the January/February 2008 issue of IEEE Power & Energy Magazine, summarized early hydroelectric developments at Niagara Falls and the establishment of 25-Hz power in most of western New York State. Here we continue this story through the second half of the 20th century and up to the eventual demise of 25-Hz power on 12 October 2006.
  • Keywords
    history; hydroelectric power stations; power system interconnection; Niagara Falls; frequency 25 Hz; hydroelectric developments; Cities and towns; Delay; History; LAN interconnection; Power generation; Power system interconnection; Reservoirs; Rivers; Synchronous motors; Water resources;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2007.915180
  • Filename
    4457963