Title :
Automatic Termination of a Protective Action
Author_Institution :
Southern California Edison Company, Box 800, Rosemead, CA 91770
fDate :
6/1/1986 12:00:00 AM
Abstract :
Subcommittee 6 of NPEC is responsible for the development of IEEE Standard 603. The adequacy of requirements concerning control and termination of protective actions was raised during the balloting of IEEE Standard 603-1980. In essence, the concern dealt with the requirement for deliberate operator action to return the system to normal. It was questioned if control actions such as automatic termination of system operation were allowed. Changes in the standard were made to clarify that there was a distinction between control (including termination) and return to normal and also to state that automatic control may be required. Additionally, an action item was identified in the forward of IEEE Standard 603-1980 to determine if any additional changes were needed. The purpose of the paper is to present the results of this additional work.
Keywords :
Automatic control; Control systems; Human factors; Nuclear power generation; Power generation; Power system protection; Safety devices; Signal design; Standards development; Terminology;
Journal_Title :
Energy Conversion, IEEE Transactions on
DOI :
10.1109/TEC.1986.4765695