DocumentCode
1127342
Title
Hierarchical Production Planning for Semiconductor Wafer Fabrication Based on Linear Programming and Discrete-Event Simulation
Author
Bang, June-Young ; Kim, Yeong-Dae
Author_Institution
Dept. of Ind. Eng., Korea Adv. Inst. of Sci. & Technol., Daejon, South Korea
Volume
7
Issue
2
fYear
2010
fDate
4/1/2010 12:00:00 AM
Firstpage
326
Lastpage
336
Abstract
This paper focuses on a production planning and scheduling problem in a semiconductor wafer fabrication facility. We propose a two-level hierarchical production planning (HPP) method that employs an itmmerative procedure for production planning and operations scheduling. In the method, production plans are obtained with a linear programming (LP) model in the aggregate level, and schedules at the machines are obtained with a priority-rule-based scheduling method and evaluated with discrete-event simulation in the disaggregate level. An iterative scheme is adopted for obtaining a good and feasible production plan. The proposed method is evaluated through simulation experiments and the results show that the method works better than an existing algorithm in terms of the total production cost and total tardiness of orders.
Keywords
discrete event simulation; electronic engineering computing; iterative methods; linear programming; production planning; scheduling; semiconductor device manufacture; discrete-event simulation; hierarchical production planning; iterative scheme; linear programming; priority-rule-based scheduling; production scheduling; semiconductor wafer fabrication; Hierarchical production planning (HPP); linear programming (LP); scheduling; semiconductor wafer fabrication; simulation;
fLanguage
English
Journal_Title
Automation Science and Engineering, IEEE Transactions on
Publisher
ieee
ISSN
1545-5955
Type
jour
DOI
10.1109/TASE.2009.2021462
Filename
5159364
Link To Document