• DocumentCode
    1144489
  • Title

    Clock synchronization on the factory floor (FMS)

  • Author

    Gora, Walter ; Herzog, Ulrich ; Tripathi, Satish K.

  • Author_Institution
    Comput. Archit. & Performance Evaluation, Erlangen Univ., Nuremberg, West Germany
  • Volume
    35
  • Issue
    3
  • fYear
    1988
  • fDate
    8/1/1988 12:00:00 AM
  • Firstpage
    372
  • Lastpage
    380
  • Abstract
    The coordination of flexible manufacturing systems (FMS) in an automated factory requires that synchronization amongst the manufacturing processes be based on a common clock. The synchronization requirements on the factory floor are described, and several clock synchronization algorithms, their theoretical bounds, and the results of the authors´ work are discussed. Measurement results based on the implementation of such synchronization algorithms on local area networks (LAN) are presented. For hierarchical LANs, an algorithm is developed and its behavior simulated
  • Keywords
    clocks; flexible manufacturing systems; local area networks; synchronisation; FMS; automated factory; clock synchronization; flexible manufacturing systems; hierarchical LANs; local area networks; manufacturing processes; synchronization algorithms; Automatic control; Clocks; Computer aided manufacturing; Control systems; Flexible manufacturing systems; Manufacturing automation; Production facilities; Production systems; Protocols; Synchronization;
  • fLanguage
    English
  • Journal_Title
    Industrial Electronics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0278-0046
  • Type

    jour

  • DOI
    10.1109/41.3109
  • Filename
    3109