DocumentCode
1144489
Title
Clock synchronization on the factory floor (FMS)
Author
Gora, Walter ; Herzog, Ulrich ; Tripathi, Satish K.
Author_Institution
Comput. Archit. & Performance Evaluation, Erlangen Univ., Nuremberg, West Germany
Volume
35
Issue
3
fYear
1988
fDate
8/1/1988 12:00:00 AM
Firstpage
372
Lastpage
380
Abstract
The coordination of flexible manufacturing systems (FMS) in an automated factory requires that synchronization amongst the manufacturing processes be based on a common clock. The synchronization requirements on the factory floor are described, and several clock synchronization algorithms, their theoretical bounds, and the results of the authors´ work are discussed. Measurement results based on the implementation of such synchronization algorithms on local area networks (LAN) are presented. For hierarchical LANs, an algorithm is developed and its behavior simulated
Keywords
clocks; flexible manufacturing systems; local area networks; synchronisation; FMS; automated factory; clock synchronization; flexible manufacturing systems; hierarchical LANs; local area networks; manufacturing processes; synchronization algorithms; Automatic control; Clocks; Computer aided manufacturing; Control systems; Flexible manufacturing systems; Manufacturing automation; Production facilities; Production systems; Protocols; Synchronization;
fLanguage
English
Journal_Title
Industrial Electronics, IEEE Transactions on
Publisher
ieee
ISSN
0278-0046
Type
jour
DOI
10.1109/41.3109
Filename
3109
Link To Document