    Solution of Large-Scale Optimal Unit Commitment Problems

  • Author

    Lauer, G.S. ; Sandell, N.R., Jr. ; Bertsekas, D.P. ; Posbergh, T.A.

  • Author_Institution
    ALPHATECH, Inc.
  • Issue
    1
  • fYear
    1982
  • Firstpage
    79
  • Lastpage
    86
  • Abstract
    This paper is concerned with the solution of large-scale unit commitment problems. An optimization model has been developed for these problems that incorporates minimum up and down time constraints, demand and reserve constraints, cooling-time dependent startup-costs, and time varying shutdown costs, as well as other practical considerations. A solution methodology has been developed for the optimization model that has two unique features. First, computational requirements grow only linearly with the number of units. Second, performance of the algorithm can be shown (rigorously) to actually improve as the number of units increases. With a preliminary computer implementation of the algorithm, we have been able to reliably solve problems with 250 units over 12 (2-hour) time periods, and we expect to be able to easily double these numbers.
  • Keywords
    Constraint optimization; Cost function; Hydroelectric power generation; Large-scale systems; Optimization methods; Power generation; Power systems; Processor scheduling; Time factors; Upper bound;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1982.317243
  • Filename
    4111142