DocumentCode
1163582
Title
Lessons learned
Author
Trenholm, Barry
Author_Institution
Petro-Canada, St. John´´s, Nfld.
Volume
12
Issue
5
fYear
2006
Firstpage
22
Lastpage
27
Abstract
This article examines the lessons learned in development and operation of the first disconnectable floating production storage and offloading (FPSO) offshore oil platform to be built for the North Atlantic. To assist in organizing the lessons learned into a framework that applies to other projects, this article investigates the following stages of the project: specification, design, construction, commissioning, operation, and maintenance
Keywords
commissioning; design engineering; maintenance engineering; offshore installations; North Atlantic; commissioning; disconnectable floating production storage-offloading; learning; maintenance; offshore oil platform design; Costs; Drives; Industrial plants; Knowledge engineering; Manufacturing; Packaging; Petroleum; Power generation; Procurement; Production facilities;
fLanguage
English
Journal_Title
Industry Applications Magazine, IEEE
Publisher
ieee
ISSN
1077-2618
Type
jour
DOI
10.1109/MIA.2006.1678383
Filename
1678383
Link To Document