    Optimal Expansion of Transformer Substations

  • Author

    Saied, Mohamed Mostafa ; Fetih, Nabil H. ; El-Shewy, Hamed M.

  • Author_Institution
    Electrical Engineering Department Assiut University
  • Issue
    11
  • fYear
    1982
  • Firstpage
    4333
  • Lastpage
    4340
  • Abstract
    Due to the increasing demand for electrical energy, the transmission capacity of existing power transformer substations must be correspondingly increased to prevent their overloading. This paper represents a new method for the optimal expansion for such substations. The optimized objective function includes the total annual cost of both the original already existing power transformers and the new parallel connected additional transformer. The independant variables for the optimization process are the power rating and the main geometrical dimensions of the new transformer. These variables affect not only the electrical parameters of the new transformer, but also govern the load sharing between the original transformers and the new one. Any condition yielding overloading of either of them is to be excluded. The results will strongly depend on the electrical and magnetic loadings assumed. It is shown that for a certain value of the new transformer core flux density, an absolute minimum for the total substation annual cost exists, whereas increasing the current density will result a monotonous decrease of the objective cost function. The new method is applied to a practical example, and several checks for its validity are given.
  • Keywords
    Capacity planning; Cost function; Energy loss; Equations; Impedance; Magnetic flux; Power transformers; Reactive power; Substations; Transformer cores;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1982.317396
  • Filename
    4111257