DocumentCode :
1180250
Title :
A Linear Programming Method for Unit Commitment Incorporating Generator Configurations, Reserve and Plow Constraints
Author :
Piekutowski, M. ; Rose, I.A.
Author_Institution :
Leeds and Northrup Australia Pty. Limited
Issue :
12
fYear :
1985
Firstpage :
3510
Lastpage :
3516
Abstract :
A method of automatic unit commitment in a predominantly thermal power system is described. Linear programming techniques are used to dispatch plant at each time interval to minimise production cost over a load peak, or a daily or weekly load cycle. Generator configurations, flow constraints, functional reserve and time-limited reserve are modelled, with the capability for individual restrictions on any unit. The method has been implemented for operator usage in a control centre.
Keywords :
Australia; Costs; Economic forecasting; Environmental economics; Linear programming; Power generation; Power generation economics; Power system modeling; Power systems; Vectors;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1985.318903
Filename :
4113050
Link To Document :
بازگشت