DocumentCode :
1181157
Title :
Bonneville´s least cost planning
Author :
Bull, Michael
Author_Institution :
Bonneville Power Adm., Portland, OR, USA
Volume :
4
Issue :
1
fYear :
1989
fDate :
2/1/1989 12:00:00 AM
Firstpage :
300
Lastpage :
304
Abstract :
The Bonneville Power Administration has been following least cost utility planning principles since the passage of the 1980 Pacific Northwest Electric Power and Conservation Planning Act (Regional Power Act). The author describes the background and current resource planning environment for the Pacific Northwest, the analytical tools used to pursue the power planning objectives, and the direction which current policy decisions are headed, using Bonneville´s 1987 resource strategy process as the example
Keywords :
power system planning; 1980 Pacific Northwest Electric Power and Conservation Planning Act; Bonneville Power Administration; least cost utility planning principles; Costs; Energy conservation; Industrial economics; Irrigation; Meeting planning; Power generation; Power generation economics; Process planning; Rivers; Strategic planning;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.32492
Filename :
32492
Link To Document :
بازگشت